.. _everest_modules_EnergyNode: ########## EnergyNode ########## | This module is part of the Energy Tree and represents a simple current fuse. ************************* Handwritten Documentation ************************* .. include:: index.inc ************************ Auto-Generated Reference ************************ Module Configuration ==================== | **fuse_limit_A**: *number* | Fuse limit in ampere for all phases. Note: this always applies in addition to limits set by external_limits interface. | **phase_count**: *integer* | phase count limit. Omit if not limited in this fuse. | **enhance_external_schedule**: *boolean* | *default: False* | When enabled, calculates per-phase current limits from total_power_W and adds them to ac_max_current_A when processing external schedules. ac_max_current_A is only enhanced in case it was not specified as part of the external schedules. Uses nominal_voltage_V for calculations. | **nominal_voltage_V**: *number* | *default: 230.0* | Nominal voltage in volts used for power to current calculations when enhance_external_schedule is enabled. This allows configuration for different regions (e.g., 120V, 230V, 400V). Provides ======== | **energy_grid**: :ref:`energy ` | This is the chain interface to build the energy supply tree | **external_limits**: :ref:`external_energy_limits ` | Additional external limits can be set via this interface. Requirements ============ | **energy_consumer**: :ref:`energy ` 1..128 | **powermeter**: :ref:`powermeter ` 0..1 | **price_information**: :ref:`energy_price_information ` 0..1 ******** Metadata ******** Authors ======= | Cornelius Claussen License ======= | https://opensource.org/licenses/Apache-2.0